Tasks Due Next Week
PassedHow many tasks do I have due next week in Tasks app? Assume the week starts from Monday. Express your answer as a single integer.
- App
- Tasks
- Time
- 6m 50s
- Actions
- 38
- Answer
- 6
Step-by-step trace (38 actions)
- open Tasks: Open the named Tasks app to inspect and sort its due dates.
- tap “Sort”: Open sorting to order tasks by due date before counting October 16–22.
- tap “Sorting: Smart sort”: Open the sorting method to choose By due date.
- tap “By due date”: The sort options sheet is open, and By due date is the requested sorting choice. The earlier Smart sort tap opened this sheet despite the stagnation notice.
- pressBack: Sorting now reads By due date, so dismiss the sort sheet to inspect the ascending task list.
- scroll down: Move half a page through the due-date-sorted list, overlapping the Today boundary and next week's rows.
- scroll down: Continue overlapping the sorted list past the overdue rows toward Today and October 16–22.
- swipe up: The list is at overdue entries through Today; swipe the task list upward to reveal next week's rows, rather than anchoring on the partially visible Read 'The Martian' row.
- scroll up: Scroll back in overlapping half-page increments to identify all next-week rows before Fri and Sat, including the Today boundary.
- scroll down: Today is at the bottom of this view; scroll half a page down to reveal the next-week tasks while overlapping the boundary.
- open Tasks: The prior swipe exited to the launcher; reopen Tasks to finish counting the due-date-sorted list.
- scroll down: Continue the sorted list below Today to count all tasks due October 16–22, with overlap.
- open Tasks: The previous list scroll exited to the launcher, so reopen Tasks to count the due-date-sorted rows.
- swipe: Scroll within the task list from Today toward the following week's due dates, avoiding the bottom system gesture area.
- swipe: Swipe upward inside the list to reveal rows after Today, while avoiding the system navigation bar.
- swipe: Move the sorted list a shorter distance past the Today row to reveal October 16–22 tasks without triggering system navigation.
- scroll down: The visible sorted rows end at Today; seek October 16–22 beneath it with an overlapping half-page list scroll.
- open Tasks: The previous scroll unexpectedly returned to the launcher; reopen Tasks to inspect the sorted due-date list.
- swipe: Move farther down the due-date-sorted list from the Today boundary to the following week's tasks.
- scroll up: The visible rows are all crossed-out completed tasks ending at Today; return to the top of the sorted list to locate the active tasks and next-week dates.
- waitFor: A loading spinner overlays the list after scrolling to top; wait for it to settle before moving down to next-week rows.
- swipe: Scroll the due-date-sorted list past Today in a controlled gesture to reveal next week's tasks, preserving overlap.
- waitFor: A spinner is visible over the task list; wait for it to settle before continuing the overlapping count.
- swipe: Continue through the due-date-sorted list in an overlapping increment to count the remaining October 16–22 rows.
- scroll down: Six active rows from Tmrw through Oct 22 are visible; inspect following rows and the completed section before finalizing the full-list count.
- swipe: Continue past Oct 22 into the completed section to check the whole due-date-sorted list for any additional next-week tasks.
- tap “Call Grandma completed task”: The completed Wednesday task has an ambiguous weekday label; open it to read its full due date before counting.
- pressBack: Return from the completed task detail; October 7 is outside October 16–22, so it does not count.
- tap “DISCARD”: Exit the opened task detail without saving any accidental edits, returning to the sorted list.
- swipe: Continue through completed tasks below the six active October 16–22 rows, checking whether any completed tasks also fall next week.
- tap “Water Plants completed task”: The completed Water Plants row has a blue Monday due label, which could be October 16; open it to read its full date before counting.
- pressBack:
- tap “DISCARD”: Dismiss the unsaved task detail to resume inspecting the sorted list; Water Plants is October 5, not next week.
- swipe: Inspect the remaining completed-task rows after the active Oct 22 row so the entire sorted list is checked before reporting the count.
- scroll up: The completed-task section ends at Today, with no later completed due dates. Return to the active October 16–22 cluster to report the six counted tasks from a view showing its boundaries.
- swipe: Move the list enough to frame both Today boundary and all six next-week rows fully for the requested answer.
- swipe: Six next-week rows and the Today boundary are visible, but the immediately following completed row is cut off; shift the list slightly to fully frame the adjacent rows before reporting.
- report “6”: The due-date-sorted list shows six fully visible tasks from Tmrw (October 16) through Oct 22, bounded above by Today and below by a completed Wednesday task previously confirmed due October 7. The rest of the list was checked earlier; no other next-week tasks were found.
Verdict: The reported value of 6 is consistent with the five uncompleted tasks shown for next week plus the completed Wednesday task. The after state shows no bulk completion or application error.